Do You Know The Construction Process Of Low Voltage Concentric Cable?

2025-04-01

Overhead laying of Low Voltage Concentric Cable refers to laying Low Voltage Concentric Cable on overhead cable poles. Compared with underground laying, overhead laying has the advantages of low cost, convenient construction, and easy maintenance. So do you know the construction plan process of Low Voltage Concentric Cable overhead laying? Including construction preparation, construction steps, precautions and other contents.

Low Voltage Concentric Cable

The first is construction preparation. According to the specifications, length, laying path and other factors of Low Voltage Concentric Cable, a detailed construction plan is prepared to prepare the required Low Voltage Concentric Cable, cable poles, connectors, fixings, insulation strips, clamps, tools, etc. Determine the construction team, including experienced cable installation workers, construction supervisors, etc. Prepare the required lifting machinery, power tools, hand tools, etc. Ensure that the construction personnel have relevant safety protection knowledge and equipment, and formulate corresponding safety management measures.


The next step is the installation step. According to the cable pole position determined by the design plan, carry out foundation excavation, pole body production and installation. According to the position of the fixings determined by the design plan, fix the fixings on the cable pole to fix the Low Voltage Concentric Cable.


According to the cable laying path determined by the design plan, first fix the cable terminal on the fixings at the top of the cable pole, and then pull the cable along the laying path.During the cable laying process, the cables need to be connected. According to the cable specifications and design requirements, the corresponding connection technology, such as welding, crimping, etc., is adopted.


It is very important to install the insulation strips and clamps. After the Low Voltage Concentric Cable is connected, it needs to be insulated and protected. First, cover the outer layer of the connection with the insulation strip, and then use the clamp to fix the insulation strip. According to the design requirements, adjust the tension of the cable to keep it at an appropriate tightness. After the cable is laid, test the cable to ensure that its electrical performance meets the requirements. After the Low Voltage Concentric Cable is laid, set the cable mark at the appropriate location to facilitate subsequent maintenance and operation. After the construction is completed, clean up the construction site to ensure a clean environment.


After the Low Voltage Concentric Cable construction is completed, acceptance work is carried out to ensure that the construction meets the design requirements. Debug the cable system and make necessary adjustments to ensure the normal operation of the equipment. Jointly debug the cable systems of each part to verify the overall operation of the system.

After completing the debugging of the cable system, conduct a final acceptance to check the quality and performance of the project.